skip to Main Content

FENDER SYSTEMS FOR PORT OF TRELLEBORG

Port of Trelleborg has two new Ferry locations and Portsuppliers Group has designed and delivered the Marine Fender Systems to both.
The choice of Fender Systems at location FL13 was closed panels with UHMW-PE face
pads and PsG LE Rubber Elements along with chain system. In the location FL14 the choice fell on PsG Arch Fender. Mooring PsG Tee Head Bollards on both locations.

Port of Trelleborg with PsG Arch Fender
Mooring Bollard from Portsuppliers Group in Port of Trelleborg
Back To Top